12%
OVERALL energy REDUCTION
<12
MONTHS ROI
The Grosvenor, A JW Marriott hotel, is a luxury 5-star hotel on Park Lane in central London. The hotel accommodation includes over 600 rooms and suites delivering the highest levels of comfort expected in such an establishment. The Great Room is the largest banqueting space, in a 5-star hotel in Europe, hosting major events such as the BAFTAs.
The property has evolved over the years as the needs have changed to meet the demands of the modern traveller and hotel operator. The property consists of three
elements, north, south and central with building services split between north and south serving the entire facility. Over time the systems have become more challenging to maintain and operate to their optimum level.
Hospitality
London
Optimised were tasked with carrying out remedial works, upgrading existing system and reducing energy consumption in an effort to improve the guest experience.
Due to its age and vast size this is not easily done, and solutions needed to be tailored to the individual challenges presented throughout the hotel.
In order to bring the site up to the latest specification to allow optimum control, the ageing Honeywell Excel BEMS was upgraded to the latest Tridium N4 platform one area at a time.
The new software platform allows the maintenance team to deliver a programme of preventative planned maintenance. The improved network architecture has allowed for a central command and control room to be setp in the hotel that offers centralised monitoring an control, complemented by alarms and alerts that enable the hotel team to deliver reactive works as they are highlighted by the dashboards. This ensures systems are always functioning optimally and are maintained when needed.
An initial assessment of the site, complemented by Optimised's Energy Analysis platform, enabled us to make immediate adjustments for instant savings and optimisation of the assets. Strategies were agreed and implemented, this included:
• analysing the base line data and energy profile
• identifying energy usage throughout the day
• aligning time schedules to match usage
• operating at suitable temperatures during the use periods without affecting the comfort conditions
• ensuring correct use of override switches
• preventing heating and cooling systems do not conflict with each other.
Once these areas were addressed, the Remote Optimisation managed service could now monitor the performance of the HVAC, BEMS and lighting systems to ensure continuous operational efficiency.
As well as providing continuous monitoring to identify anomalies and generate reports, alerts and ongoing energy management recommendations.
The hotel and Optimised teams continued to work closely together, monitoring the building’s systems, playing an active role in assisting
the key stakeholders in making the right decisions to improve the operation of the property.
The optimisation process is on going and to date the hotel has achieved an 23.7% reduction in HVAC energy consumption resulting in a pay back for the hotel of less than 11 months.
Year 1 Results
£ Savings | £331,000 |
---|---|
CO2 Reduction | 763,362 kg |
kWh Savings | 2,932,000 kWh |
% of Total Energy Spend | 11.87% |
% of HVAC Energy Spend | 23.7% |
Annual Comparison
Optimised have been instrumental in transforming the way we operate the hotel from an engineering perspective while significantly reducing our energy expenditure and improving guest comfort.
Gordon Ormand
Director of Engineering
Fill in your details below to arrange a complimentary consultation with one of our experts. They will give you bespoke advice to help your business achieve all its energy needs, reducing cost, consumption and carbon.
ASHBY DE LA ZOUCH
1 Ivanhoe Office Park
Ivanhoe Park Way
Ashby de la Zouch
Leicestershire, LE65 2AB
BLACKPOOL
109-112
Lancaster House
Amy Johnson Way
Blackpool, FY4 2RP
BRISTOL
Hanover House
Queen Charlotte Street, Bristol, BS1 4EX
SITTINGBOURNE
The Oast
62 Bell Road
Sittingbourne
Kent, ME10 4HE